Scope of Work:

  • Prep the job for demo: install 6 mil plastic on the hardwood floors and installed the tarp on the on 6 mil plastic to protect the hardwood floors and a quarter inch plywood around the walls.
  • Demolition: remove drywall from the walls, remove 5/8 plywood from the walls, remove the metal framing.
  • Rebuild the walls: reframe the walls wood 3-5/8″ metal studs framing and install 5/8″ plywood on The walls and then install drywall and finish with a level 4 finish.
  • Detail clean up, remove all of the quarter inch plywood the tarps and the 6 mil plastic and a detail clean up on the hardwood floors.

Nasher Museum of Arts

Owner

Duke University

Approx Contract

$70,000

Completion date

Jan 2019